Friday, December 27, 2024

Generating Workday BIRT Reports: Step-by-Step Guide



Here's a detailed step-by-step guide on how to generate Workday BIRT (Business Intelligence and Reporting Tool) reports:

---

# **Generating Workday BIRT Reports: Step-by-Step Guide**

## **Introduction to BIRT in Workday** Workday BIRT reports are custom report templates designed using the BIRT tool to create pixel-perfect layouts for operational and transactional reports. These templates can include advanced formatting, custom layouts, and embedded graphics.

---

## **Step 1: Prerequisites**

1. **Access to Workday and Reporting Permissions**: - Ensure you have the necessary permissions in Workday to create and manage reports.

2. **Install BIRT Designer**: - Download and install the Eclipse-based BIRT Designer tool from [Eclipse BIRT](https://www.eclipse.org/birt/).

3. **Familiarity with Workday Report Writer**: - Understand how Workday’s standard report writer works, as BIRT uses custom templates linked to advanced reports.

4. **Technical Knowledge**: - Knowledge of XML data sources, XPath, and design principles for creating report templates.

---

## **Step 2: Design and Build the Advanced Report in Workday**

1. **Create an Advanced Report**: - In Workday, navigate to the “Create Report” task. - Choose **Advanced Report** as the type. - Add the required **Data Sources** and fields based on the report’s purpose. - Filter the data using prompts, conditions, or sorting.

2. **Enable Report for BIRT**: - Go to the advanced report properties and check the option **Enable as BIRT report**.



3. **Generate and Export the XML Output**: - Run the report to generate the XML output. - Save the XML file, which will serve as the data source for your BIRT template.

---

## **Step 3: Develop the BIRT Template**

1. **Launch the BIRT Designer**: - Open the BIRT Designer tool installed on your system.

2. **Create a New Report**: - Start a new report project and name it appropriately.

3. **Import the XML Data Source**: - Add the XML file (exported from Workday) as a data source in BIRT. - Define data sets by mapping fields in the XML file to elements in the report.

4. **Design the Report Layout**: - Use BIRT's drag-and-drop interface to design the report layout. - Include elements such as: - **Tables**: For structured data. - **Charts**: For visual data representation. - **Images and Logos**: For branding. - **Headers and Footers**: For consistent styling.

5. **Add Formatting and Styles**: - Apply custom styles to enhance readability. - Configure fonts, alignments, and color schemes to align with your organizational standards.

6. **Preview the Report**: - Use the preview option to ensure the layout aligns with expectations and displays data correctly.

---

## **Step 4: Upload the BIRT Template to Workday**

1. **Compress the Template**: - Save the BIRT template file as a `.rptdesign` file. - Compress it into a `.zip` file.

2. **Upload the Template**: - In Workday, navigate to the “Maintain BIRT Layout Templates” task. - Upload the `.zip` file and associate it with the appropriate advanced report.

3. **Test the Report**: - Run the advanced report with the uploaded BIRT template to verify the output.

---

## **Step 5: Refine and Optimize**

1. **Review and Adjust**: - Adjust the BIRT template or advanced report settings based on feedback or issues identified during testing.

2. **Performance Optimization**: - Simplify data sources and reduce unnecessary computations to optimize report performance.

3. **Deploy for End Users**: - Share the report with end users, ensuring proper access permissions are set in Workday.

---

## **Step 6: Maintenance and Updates**

1. **Update Templates as Needed**: - Make changes to the BIRT template or advanced report to reflect evolving business requirements.

2. **Monitor Usage**: - Track the usage and performance of the report in Workday to ensure it meets user needs.

3. **Train Users**: - Provide training for end users on interpreting and using the report effectively.

---

This step-by-step process ensures the successful creation and deployment of Workday BIRT reports, enabling high-quality, customized reporting tailored to your organizational needs.



No comments:

Post a Comment

How to do mirroring payroll data from another platform for the last two months in ERPNext

  Mirroring payroll data from another platform into ERPNext for the last two months involves several steps, including data extraction, tran...